Pac standard weathertightness flashing inclusive 20 year warranty.
Typical metal deck roof detail.
Always be aware of your position on the roof relative to any roof openings roof edges co workers and penetrations.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
2 deep roof deck and has since replaced the previous industry standard 36 5 and 36 7 attachment patterns.
Roofing membrane construction details.
Sign up now to get the latest metal roofing and metal architectural product news 6 times a year.
First to the west coast market our new smooth series rivet attachment offers a.
Typical deck details based on the 2015 virginia residential code the design details in this document apply to residential single level decks only.
Roof deck when roof slopes are 3 12 or less.
And berridge metal roofing panels.
Other innovations include n 32 a 32 wide 3 deep roof deck panel and our new smooth series rivet attachment for our portfolio of cellular deck products.
Ice and watershed 2.
The original purpose for using rosin paper as a separation.
Fascia to soffit transition 1.
Metal deck with lightweight concrete cross section ftr lws1 pdf.
These installation instructions and the following typical details are intended.
Wear soft soled shoes to improve traction and to minimize damage to the paint finish.
Metal roofing panels are slippery when wet dusty frosty or oily do not attempt to walk on a metal roof under these conditions.
100 dan road canton ma 02021 phone 1 800 451 2504 sales 1 800 576 2358.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per slope that will provide adequate drainage.
Roof pitch the metal roofing panels shown in this manual require a min imum slope of 2 สบ per foot to ensure proper drainage.
Assembly illustrations drawing title drawing.
A copy of this document must be on the job site and available during each required inspection.
Construction cannot deviate from the details herein unless prior approval is obtained by the county.
Fibertite green vegetated roof system standard multilayer system w vector mapping mesh ftg dsml2 pdf.