Bend each hanger wire to a 90 degree angle 3 4 above the string line.
Usg drop ceiling installation guide.
Examine the ceiling to find the lowest pipe duct or conduit.
Usg donn brand dxf dxlf fineline 9 16in.
Snap a chalk line marking the top of the wall angle.
Below the lowest air duct pipe or beam.
W usg donn brand.
Usg donn brand dx dxl concealed 15 16in.
Choose a ceiling height.
Usg donn brand dxw wide faced 1 1 2in.
Install wall molding mark the desired new ceiling height on the wall.
Standard application guide ic592 for more information about usg stabilizer bars in plank and large panel applications.
Snap a chalk line around the entire room perimeter 3 4 in.
Use for standard ceiling perimeters.
Usg donn brand dxt dxlt centricitee 9 16in.
For additional information see the usg exterior ceiling systems guide sc2561 which contains design considerations test results and construction details including.
This installation guide identifies and defines components used in each system and provides step by step instructions used to install each of the six usg exterior ceiling systems.
Slip a special outside corner piece over the flange to hide the corner cut.
Install hanger wire or.
Nail the wall angle at every stud with 1 1 4 in.
Attach a hanger wire to each screw and cut 6 below the string line.
Above the desired ceiling height.
Or 101 6 mm is recommended below the lowest air duct pipe or beam to install panels.
Trim main tees so that a cross tee slot lines up with the cross tee string.
Usg donn brand dxla aluminum capped fire rated 15 16in.
Mark a perimeter chalk line.
2 measure three quarters of an inch up toward.
Installing 2 x 4 drop ceiling panels determine the size of the border panels to get the length of your border panels divide the width of the room by the.
Snap the chalk line tool to create this.
Measure down 4 inches from the bottom of this object and make a small mark on the wall.
Usg suspension systems accessories.
Choose the ceiling height.
Usg donn brand dx dxl standard 15 16in.
Allow clearance of at least 4 in.
Use in clean room applications with usg donn.
How to install a suspended ceiling for 2 x 2 ft.
Cross tees dotted lines are installed parallel to the main tees 2 ft.
Install your ceiling at any level as long as you maintain enough clearance 4 in.
Snap a chalk line 3 4 in.
Pull each hanger wire.