Once you ve figured out the size of the border row measure back from the cross tee slots and cut your main tees to size.
Usg drop ceiling installation.
With an unparalleled variety of choices no matter what your ceiling needs we have you covered.
Radar acoustical ceiling panels contain a proprietary broad spectrum standard formulation that inhibits the growth of mold and mildew.
Usg donn brand dx dxl concealed 15 16in.
Bend each hanger wire to a 90 degree angle 3 4 above the string line.
Choosing the best ceiling for your project can make all the difference.
Trim main tees so that a cross tee slot lines up with the cross tee string.
Don t assume the wall is straight.
Cut the main tees for the drop ceiling hangers.
Usg donn brand dx dxl standard 15 16in.
Although the components cannot be bent at the jobsite usg offers complete factory curved components for curved ceilings domes and vaults.
Usg donn brand dxt dxlt centricitee 9 16in.
Installing 2 x 4 drop ceiling panels determine the size of the border panels to get the length of your border panels divide the width of the room by the length of a single panel add the remainder to the length of a single panel and divide by 2.
Snap a chalk line at this.
Attach a hanger wire to each screw and cut 6 below the string line.
Measure down 4 inches from the bottom of this object.
Where two cross tees occupy the same slot insert the second cross tee to the left of the first cross tee.
Ceiling designs can be submitted and all of the parts and pieces for the installation will be manufactured and shipped out as a kit for faster and easier installation.
Pull each hanger wire through a round hole below the bulb of the main tee and bend up twisting the end 3 1 2 turns within a 2 in.
Pull each hanger wire.
The cross tee slots must line up.
Medium textured with a non directional pattern these sag resistant panels are an optimal choice for use in schools corridors lobbies offices and retail stores.
Usg donn brand dxla aluminum capped fire rated 15 16in.
Measure and cut the main tees according to a cross tee guideline.
Examine the ceiling to find the lowest pipe duct or conduit.
How to install a usg suspended ceiling 1.
Install lag screws at 4 intervals along the main tee string lines.
Place usg wall.
Usg donn brand dxf dxlf fineline 9 16in.